Wardana, Bima Triaji (2025) MINIMASI WASTE PRODUKSI SIDE CHAIR DENGAN LEAN MANUFACTURING DI UD MUSTIKA AGUNG MAGETAN. S1 thesis, Universitas PGRI Madiun.
|
Text
Halaman Depan.pdf Download (783kB) |
|
|
Text
Astrak Terbaru.pdf Download (116kB) |
|
|
Text
BAB I.pdf Download (123kB) |
|
|
Text
BAB II.pdf Download (382kB) |
|
|
Text
BAB III.pdf Restricted to Repository staff only Download (325kB) | Request a copy |
|
|
Text
BAB lV.pdf Restricted to Repository staff only Download (1MB) | Request a copy |
|
|
Text
BAB V.pdf Download (113kB) |
|
|
Text
Daftar Pustaka.pdf Download (127kB) |
|
|
Text
Lampiran.pdf Restricted to Repository staff only Download (117kB) | Request a copy |
Abstract
To produce quality products, companies need to maintain optimal production line balance. This balance can only be achieved effectively and efficiently if the company is able to minimize waste. This is important, considering that manufacturing companies tend to use a lot of materials, which have the potential to cause waste in their production process. Related to the 7 relationships between waste, 2 wastes occurred at UD. Mustika Agung, namely waste that occurs in the side chair production process is the presence of defective products and inventory, namely the accumulation of side chairs. The accumulation of half-finished side chairs occurs due to queues in the finishing process. Efforts that can be made include reducing waste, one of which can be achieved by implementing Lean Manufacturing and how recommendations for improvements to reduce waste that occurs in the side chair product process based on the results of the Value State Mapping (VSM) process. The results of the implementation of lean manufacturing at UD. Mustika Agung show the identification of the types of waste that occur, which are shown through the classification of waste based on the cycle time current state map, namely VA 5935 minutes, NNVA namely transportation 90 minutes, and NVA namely 50 minutes. After the repairs were made, the cycle time on the future state map became VA 3045 minutes, NNVA 65 minutes, and NVA became 10 minutes.
| Item Type: | Thesis/Skripsi/Tugas Akhir (S1) |
|---|---|
| Kata Kunci: | lean manufacturing, waste relationship matrix |
| Subjects: | T Technology > T Technology (General) T Technology > TT Handicrafts Arts and crafts T Technology > TX Home economics |
| Divisions: | Fakultas Teknik > Teknik Industri |
| Depositing User: | WARDANA TRIAJI BIMA |
| Date Deposited: | 15 Aug 2025 03:50 |
| Last Modified: | 15 Aug 2025 03:50 |
| URI: | http://eprint.unipma.ac.id/id/eprint/4018 |
Actions (login required)
![]() |
View Item |
