Analisis Perencanaan Produksi pada PT Linggarjati Mahardika Mulia Pacitan dengan Menggunakan Metode Forecasting

Fikri, Musthofa Nur (2024) Analisis Perencanaan Produksi pada PT Linggarjati Mahardika Mulia Pacitan dengan Menggunakan Metode Forecasting. S1 thesis, Universitas PGRI Madiun.

[img] Text
Halaman Depan.pdf

Download (477kB)
[img] Text
Abstrak.pdf

Download (31kB)
[img] Text
ABSTRACT.pdf

Download (30kB)
[img] Text
BAB 1.pdf

Download (101kB)
[img] Text
BAB 2.pdf

Download (364kB)
[img] Text
BAB 3.pdf
Restricted to Repository staff only

Download (208kB)
[img] Text
BAB 4.pdf
Restricted to Repository staff only

Download (864kB)
[img] Text
BAB 5.pdf

Download (79kB)
[img] Text
Daftar Pustaka.pdf

Download (78kB)
[img] Text
Lampiran.pdf

Download (907kB)

Abstract

Fluctuations in demand require companies to plan production well so that consumer demand is met on time and inventory does not run out. This study aims to determine the right forecasting method for production planning at PT Linggarjati Mahardika Mulia Pacitan and project demand in 2024. The forecasting results will be used to plan the need for raw materials for plywood production. Forecasting method analysis uses methods such as Moving Average, Single Exponential Smoothing, Double Exponential Smoothing, Holt Winters, Decomposition and Linear Regression. Then raw material planning uses the EOQ method and formulas to calculate safety stock and re-order points. In the research process that has been carried out, it can be concluded that the right forecasting method is to use the Winters` method with a level value of 0.8 trend 0.01 and seasonal 0.01 and the amount of plywood demand in the 2024 period is 10069.80 m3. The need for log raw materials is 15,104.70 m3, then the EOQ calculation is 3,545 m3 with an ordering frequency of 4 times. The amount of safety stock log is 137,133 m3 with ROP 476.98875 m3. The need for glue raw materials is 703,075.45 Kg, then the EOQ calculation is 144,359.2414 Kg with an ordering frequency of 5 times. The amount of glue safety stock is 2,727.821 Kg with ROP 9,488.162371 Kg. The need for flour raw materials is 143,329.50 Kg, then the EOQ calculation is 32,600.6517 Kg with an ordering frequency of 5 times. The amount of flour safety stock is 556.0958 Kg with ROP 1934.264 Kg.

Item Type: Thesis/Skripsi/Tugas Akhir (S1)
Kata Kunci: Deret Waktu; Kayu Lapis; Peramalan; Perencanaan Produksi
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: FIKRI NUR MUSTHOFA
Date Deposited: 06 Aug 2024 05:46
Last Modified: 18 Sep 2024 04:18
URI: http://eprint.unipma.ac.id/id/eprint/825

Actions (login required)

View Item View Item