AVANDY, DICY SEFTIAN (2024) ANALISIS PENINGKATAN PROSES FINISHING MENGGUNAKAN METODE STOPWATCH TIME STUDY DAN LARGEST CANDIDATE RULE PADA KERETA EKSEKUTIF ARGO LAWU NEW GENERATION DI PT. XYZ. S1 thesis, Universitas PGRI Madiun.
Text
Halaman Depan.pdf Download (577kB) |
|
Text
ABSTRAK.pdf Download (48kB) |
|
Text
BAB 1.pdf Download (39kB) |
|
Text
BAB 2.pdf Download (308kB) |
|
Text
BAB 3.pdf Restricted to Repository staff only Download (123kB) |
|
Text
BAB 4.pdf Restricted to Repository staff only Download (742kB) |
|
Text
BAB 5.pdf Download (29kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (168kB) |
|
Text
LAMPIRAN.pdf Download (926kB) |
Abstract
PT. XYZ is a state-owned company operating in the railway industry in Indonesia. The Stopwatch Time Study Method is a method for measuring working time using a stopwatch. The Large Candidate Rules Method is a method for balancing production lines. From the results of measurements carried out for the Executive train finishing process, it was found that the standard time was 192.29 hours. Meanwhile, improvements in the finishing process have increased, with the Average Line Efficiency which was previously 48.60% increasing to 56.34%, the Total Idle Time which was previously 85.54 Hours becoming 75.60 Hours, the Average Balance Delay which was previously 51.40% becoming 43.66%, the Total Smoothness Index increasing previously 10.69% increased to 9.45%.
Item Type: | Thesis/Skripsi/Tugas Akhir (S1) |
---|---|
Kata Kunci: | Executive Train, Finishing Process, Large Candidate Rule, Stopwatch Time Study. |
Subjects: | A Social Sciences > HD Industries. Land use. Labor A Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | AVANDY SEFTIAN DICY |
Date Deposited: | 14 Aug 2024 03:52 |
Last Modified: | 18 Sep 2024 04:13 |
URI: | http://eprint.unipma.ac.id/id/eprint/1226 |
Actions (login required)
View Item |